{"id":51205,"date":"2024-09-27T16:33:28","date_gmt":"2024-09-27T10:48:28","guid":{"rendered":"https:\/\/www.nepallivetoday.com\/?p=51205"},"modified":"2024-09-27T16:33:28","modified_gmt":"2024-09-27T10:48:28","slug":"jomsom-kagbeni-road-section-blacktopped","status":"publish","type":"post","link":"https:\/\/www.nepallivetoday.com\/2024\/09\/27\/jomsom-kagbeni-road-section-blacktopped\/","title":{"rendered":"Jomsom-Kagbeni road section blacktopped"},"content":{"rendered":"\n<p><strong>Myagdi:<\/strong> A 13-kilometer road from Jomsom to Kagbeni under the national pride project, Kaligandaki Corridor, has been blacktopped. The road section has been widened to 11 meters.<\/p>\n\n\n\n<p>A contract was signed to blacktop the Jomsom-Kagbeni section at a cost of Rs 281.4 million. Information Officer of Beni-Jomsom-Korala Road Project, Bishnu Chapagain said the blacktopping task has been completed and activities related to road furniture have reached the final phase.&nbsp;<\/p>\n\n\n\n<p>Of the 110-kilometer from Jomsom to Korala check point, 75-kilometer road has been expanded and gravelled.&nbsp; Ninety-two per cent construction along 25-kilometer Charang-Chhoser section has been completed.<\/p>\n\n\n\n<p>Project Chief Dhurba Kumar Jha shared that road from Jomsom to Korala would be gravelled after completion of the upgrading task of Charang-Chhoser section. (RSS)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Myagdi: A 13-kilometer road from Jomsom to Kagbeni under the national pride project, Kaligandaki Corridor, has been blacktopped. The road section has been widened to 11 meters. A contract was signed to blacktop the Jomsom-Kagbeni section at a cost of Rs 281.4 million. Information Officer of Beni-Jomsom-Korala Road Project, Bishnu Chapagain said the blacktopping task [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":51206,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[5,15],"tags":[],"class_list":["post-51205","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy","category-top-stories"],"acf":[],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.nepallivetoday.com\/wp-content\/uploads\/2024\/09\/Jomsome-Kagbeni-Road-Pitch-1-1727412005.jpg?fit=1500%2C844&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/pcWLTd-djT","_links":{"self":[{"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/posts\/51205","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/comments?post=51205"}],"version-history":[{"count":1,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/posts\/51205\/revisions"}],"predecessor-version":[{"id":51207,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/posts\/51205\/revisions\/51207"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/media\/51206"}],"wp:attachment":[{"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/media?parent=51205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/categories?post=51205"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/tags?post=51205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}