{"id":51759,"date":"2024-10-31T11:37:11","date_gmt":"2024-10-31T05:52:11","guid":{"rendered":"https:\/\/www.nepallivetoday.com\/?p=51759"},"modified":"2024-10-31T11:37:12","modified_gmt":"2024-10-31T05:52:12","slug":"upper-rahughat-hydropower-project-in-final-phase-of-construction","status":"publish","type":"post","link":"https:\/\/www.nepallivetoday.com\/2024\/10\/31\/upper-rahughat-hydropower-project-in-final-phase-of-construction\/","title":{"rendered":"Upper Rahughat hydropower project in final phase of construction"},"content":{"rendered":"\n<p><strong>Myagdi:<\/strong> The 48.5-MW Upper Rahughat Hydropower Project being constructed over the Rahuganga River has reached final phase of its construction. <\/p>\n\n\n\n<p>The 4,900-metre-long tunnel of the project having a dam in Raghuganga rural municipality-7, at Chimkhola and a power house in ward-4, Dagnam, is being lined up. <\/p>\n\n\n\n<p>Engineer at Upper Rahughat proejct, Narottam Karki said the construction of power house, dam, tunnel and transmission line has reached the final stage. <\/p>\n\n\n\n<p>He informed that the physical progress of the project was nearly 85 percent and the target of generating electricity by June 2025 is going on in full swing. (RSS)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Myagdi: The 48.5-MW Upper Rahughat Hydropower Project being constructed over the Rahuganga River has reached final phase of its construction. The 4,900-metre-long tunnel of the project having a dam in Raghuganga rural municipality-7, at Chimkhola and a power house in ward-4, Dagnam, is being lined up. Engineer at Upper Rahughat proejct, Narottam Karki said the [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":27182,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[5,15],"tags":[],"class_list":["post-51759","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy","category-top-stories"],"acf":[],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.nepallivetoday.com\/wp-content\/uploads\/2022\/04\/Budhi-Gandaki-Hydropoer-project.png?fit=1280%2C720&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/pcWLTd-dsP","_links":{"self":[{"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/posts\/51759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/comments?post=51759"}],"version-history":[{"count":1,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/posts\/51759\/revisions"}],"predecessor-version":[{"id":51760,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/posts\/51759\/revisions\/51760"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/media\/27182"}],"wp:attachment":[{"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/media?parent=51759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/categories?post=51759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nepallivetoday.com\/wp-json\/wp\/v2\/tags?post=51759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}